Top 10 Long Lead Multi Plug Extension Sockets UK – Electronics

As an Amazon Associate I earn from qualifying purchases.

1. TOPREK

#ad

3250W/13A, UK Power Strip for Desk Home Office Travel, Cube Extension Lead with USB Slots, 2M Extension Cord, TOPREK 5 Way Power Strip with 5 AC Outlet 4 USB USB-C 20W PD3.0 Fast Charger 1 Switch

#ad
TOPREK #ad - 9 in 1 cube extension leadwith 5 ac outlets, you can power and charge up to 9 devices from a single compact hub. During your trip, dorm room, you don’t need to bring extra extension cord and adapters any more. 7 types of safety protectionover-current protection, Fire Resistance, Overload Protection, Short-Circuit Protection, Overvoltage Protection, Over-Charging Protection, Over Temperature Control.

Three times faster than a 5W charger. Smart usb chargingtoprek power strip has 1 usb-c and 3 usb-a, among which the usb-c port is PD 3. 0 fast charging, with a maximum power of 20W, which can automatically identify connected devices and provide optimal charging speed. 2m extension cordusing 1. 5mm2 pure copper 2m extension cord and 13Amp plug with fuse, the maximum power is 3250W, which allows the safe use of high-power equipment.

Stylish & compactthe power strip with usb ports features mini cubic size 9. 15x9. 15x9. 9 cm, bathroom, guest room, is stylish and small footprint. This is a great accessory for your desk or nightstand, 1 USB-C port and 3 USB-A charging ports, easily putting plugs and USB charging ports in arm’s reach. A must-have desktop power strip for your home office, kitchen, nightstand, hotel etc.
BrandTOPREK #ad
ManufacturerShenzhen Ainisi Technology Co., Ltd #ad
Height3.9
Length3.6
Width3.6
Part NumberVE4U5K-C
Warranty1 Year Warranty Against Manufacturer Defects

2. Masterplug

#ad

2 Metres, 6.2 cm*8.7 cm*20.6 cm, Masterplug SRGDSU62PB-MP Six Socket Switched Inline Power Surge Protected Extension Lead with Two USB Charging Ports, Gloss Black

#ad
Masterplug #ad - Masterplug is part of luceco plc: They guarantee against faulty materials and workmanship and comes with a £1000 connected equipment three year warranty. Protect your electrical appliances from power surges and spikes: Switching on and off fluorescent lights and appliances such as refrigerators, washing machines and tumble dryers can cause power surges, which over time can seriously damage electronic equipment.

Trust in the ‘smart’ usb features: which standby once your device has fully charged and it can also auto detect your USB device and adjust its charging pattern – making it suitable for iPhone and android appliances.

Use efficiently around the home with wall fixing capability: Giving you the option to mount the 2 m extension lead onto the wall, if you are struggling with available ground space. The six socket extension lead has a 13 amp fuse with safety shuttered sockets: Eliminating the problem when the number of electrical items outnumber the amount of available sockets.
BrandMasterplug #ad
Manufacturermasterplug #ad
Height2.44
Length3.43
Weight1.1
Width8.11
Part NumberSRGDSU62PB-MP
ModelSRGDSU62PB

3. anhoyo

#ad

UKCA/CE Listed, 13Amp Extension Cord Surge Protected Extension Cable 1.8M with Indicator Lights, Wall Mounted, White4Way-1.8Meters, Anhoyo 4Way Extension Lead with Individual Switches

#ad
anhoyo #ad - 6ft power extension:6feet/1. 8minclude plugs long extension cords. Multiple protection:the power extension made by one-piece copper strip technology with overload, short-circuit, high-temperature protection.

The power strip with long cord made by 3*1. 25mm great heat dissipation copper wire. Rated for use with a maximum electrical of 13A/250V/3250W. Made by fire-resistant material, certified by ATSA, CE, RoHS. Indicator light:built-in protected indicator allows you to identify it is working properly and if the connected electronics are properly protected. Fire-retardant material:heavy pvc coating, integrated copper wiring, and flame retardant casing to create an safe power source.

Fireproof shell can withstand temperatures up to 850°C, which maximizes safety performance. Mounting holes:designed with 2 mounting holes on the back for easy installation, worktop, dresser, it is perfect for nightstand, you can mount this USB power charging station with 2 screws to the wall easily, desktop.
Brandanhoyo #ad
ManufacturerDong Guan Qi Shi Intelligent Technology Co.,Ltd #ad
Weight0.35 kg (0.77 Pounds)
Part NumberA-UK
ModelJN9
Warranty2Years Warranty

4. anhoyo

#ad

Anhoyo 4 Way Extension Lead with Individual Switches, UKCA/CE Listed, Wall Mounted, 13Amp Extension Cord Surge Protected Extension Cable 3M with Indicator Lights, White 4Way-3Meters

#ad
anhoyo #ad - Indicator light:built-in protected indicator allows you to identify it is working properly and if the connected electronics are properly protected. 9. 84ft power extension:9. 84 feet/3minclude plugs long extension cords.

The power strip with long cord made by 3*1. 25mm great heat dissipation copper wire. Rated for use with a maximum electrical of 13A/250V/3250W. Multiple protection:the power extension made by one-piece copper strip technology with overload, short-circuit, high-temperature protection. Made by fire-resistant material, certified by ATSA, CE, RoHS. Fire-retardant material:heavy pvc coating, integrated copper wiring, and flame retardant casing to create an safe power source.

Fireproof shell can withstand temperatures up to 850°C, which maximizes safety performance. Mounting holes:designed with 2 mounting holes on the back for easy installation, it is perfect for nightstand, you can mount extension cord with 2 screws to the wall easily, worktop, dresser, desktop.
Brandanhoyo #ad
ManufacturerDong Guan Qi Shi Intelligent Technology Co.,Ltd #ad
Weight1.3
Part NumberA-UK
Warranty2Years Warranty

5. anhoyo

#ad

Wall Mounted, White4Way-5Meters, Anhoyo 4Way Extension Lead with Individual Switches, 13Amp Extension Cord Surge Protected Extension Cable 5M with Indicator Lights, UKCA/CE Listed

#ad
anhoyo #ad - Multiple protection:the power extension made by one-piece copper strip technology with overload, short-circuit, high-temperature protection. Mounting holes:designed with 2 mounting holes on the back for easy installation, it is perfect for nightstand, you can mount this USB power charging station with 2 screws to the wall easily, worktop, dresser, desktop.

Indicator light:built-in protected indicator allows you to identify it is working properly and if the connected electronics are properly protected. The power strip with long cord made by 3*1. 25mm great heat dissipation copper wire. Rated for use with a maximum electrical of 13A/250V/3250W.

16. 4ft power extension:16. 4feet/5minclude plugs long extension cords. Fire-retardant material:heavy pvc coating, and flame retardant casing to create an safe power source. Fireproof shell can withstand temperatures up to 850°C, integrated copper wiring, which maximizes safety performance. Made by fire-resistant material, certified by ATSA, CE, RoHS.
Brandanhoyo #ad
ManufacturerDong Guan Qi Shi Intelligent Technology Co.,Ltd #ad
Part Number1
ModelASDF97
Warranty2Years Warranty

6. Traveldapter

#ad

Uk To Europe Adapter Power Strip Smart USB Usb-C Port Extension Charger 3 Way Uk Outlets Ireland Holland Germany 2 M Extension Cord

#ad
Traveldapter #ad - Keep all your gadgets safe: unlike all those cheaply-made electric converters, earthed plug for safety which is certified for protection. This high quality item also has a switch to ensure safety at all times. Travel fuss-free: our lightweight and compact power strip can fit in your hand luggage, backpack or laptop case and works in numerous countries! Eliminate clutter, hassle & bending: no more bending to find sockets, no more clutter in your suitcase.

One power adapter to rule them all: the british based family run business presents you with Traveldapter for international travel. Our leads are much thicker than the others making our adapter much safer from heating up and fires. We also use non universal sockets so pins make complete contact within the socket board, we use a moulded, satisfying important safety requirements.

Our products are here to help you safely charge all your electronic devices at your finger tips no matter where you are! Peace of mind on-the-go: don't leave home without your travel adapter, which is perfect for business trips and family vacations thanks to the multiple sockets including 3 type G sockets with safety sliders, 3 fast charging USB ports and 1 USBc fast charging port ensuring you are fully covered. Our worldwide travel plug comes with a 2m long cable that will eliminate fumbling and accidents.
BrandTraveldapter #ad
ManufacturerTraveldapter #ad
Height1.18
Length7.87
Weight0.73
Width1.97
Part NumberEU4G
ModelEUR/1
WarrantyWarranty VOID is product is opened

7. TESSAN

#ad

UK to European Plug Adapter with 3 USB, TESSAN Grounded EU Euro Europe Travel Plugs, Schuko European Adaptor for France Spain Iceland Austria Poland Germany Portugal Turkey Greece and More Type E/F

#ad
TESSAN #ad - Made of fireproof material, the shell can prevent impact and ensure your valuable devices safe more. The mounting screw behind the Euro adapter plug can be adjusted to secure it firmly on the wall, so you don't have to worry about falling off.

Stable screw base: tessan uk to european plug adaptor provides stable for your devices. Schuko type e/f plug: eu adapter plug compatible in most europe countries as Germany, Belgium, Spain, Poland, Portugal, Norway, Iceland, Greece, Turkey, Morocco, Denmark, Finland, France, Sweden And more not include Italy.55 in 1 euro plug adapter: this uk to eu plug adapter with usb converts a European wall socket to 2 UK AC outlets and 3 USB slots, which can support 5 electrical devices charging simultaneously.

Please confirm your devices compatible with dual voltage or worldwide voltage devices with input voltage range from 100-240V. Instructions for use: this uk plug adapter to eu is not a voltage converter. Multiple protection: the european travel adapter with ground connection can provide much safety for your devices.
BrandTESSAN #ad
ManufacturerTESSAN #ad
Weight0.16 kg (0.35 Pounds)

8. SAMERIVER

#ad

8 Way Multi Plug Extension Tower with Surge Protection Extension Cord Switch 13A 3250W, Tower Extension Lead with 4 USB Slots, 2M Extension Cable Power Strip for Home, Office, Bedroom.

#ad
SAMERIVER #ad - All-round protection: tower extension lead is certified by fcc and rohs etc, tower extension lead have passed the tests of authoritative testing institutions, and the products meet the safety requirements. 12-in-1 tower extension lead: extension cord with 8 ac outlets in different directions and 4 USB ports can charge 12 electronics at the same time.

We promise a worry-free 18-month warranty and 24 hours quick reply service. You can turn off all electronic devices when not in use to save energy, In the event of a power overload, also, the red button at the bottom serves as an overload protection switch, it can also provide excellent protection for your electronic equipment. Such as your computer, MP3, cellphone, tablet. Usb-c delivering 3. 0a max, each uSB-A 2.

4a max with smart ic charging technology, will automatically identify the connecting devices and output optimal charging speed for your devices. 3m 100% pure copper power extension long cord ensures excellent heat dissipation and great conductivity, ensure an all-round protection for you and your electronic devices. Do not plug portable heaters, but plug them into a dedicated mains power outlet. Smart usb charging: tower extension lead has 4 usb portsmax output 3. 4a/17w in total.
BrandSAMERIVER #ad
ManufacturerSameriver #ad
Height0.1 cm (0.04 Inches)
Length8.8 cm (3.46 Inches)
Width8.8 cm (3.46 Inches)
ModelZYC08
Warranty1 Year Warranty Against Manufacturer Defects

9. SAMERIVER

#ad

Office, Tower Extension Lead with USB Slots, 8 Way Mini Tower Extension Lead with 4 USB Ports13A 3250W Multi Plug Extension Tower 2M Extension Cable Surge Protection Extension Lead for Home, Kitchen

#ad
SAMERIVER #ad - With a tower design you can tidy your cable and gives your usb devices a safe faster speed charge! Create an organised and neat space. 12-in-1 tower extension lead: extension cord with 8 ac outlets in different directions and 4 USB ports can charge 12 electronics at the same time.

3m 100% pure copper power extension long cord ensures excellent heat dissipation and great conductivity, ensure an all-round protection for you and your electronic devices. Do not plug portable heaters, but plug them into a dedicated mains power outlet. We promise a worry-free 18-month warranty and 24 hours quick reply service. All-round protection: tower extension lead is certified by fcc and rohs etc, tower extension lead have passed the tests of authoritative testing institutions, and the products meet the safety requirements. Security tips: please check the power requirements of your appliances before use, refrigerators or large lottery appliances into the switchboard, the total power of the connected appliances is not allowed to exceed the rated power 3250W.

Such as your computer, MP3, cellphone, tablet. Multiple protection: a switch on the bottom of the plug extension tower controls the entire power supply. Usb-c delivering 3. 0a max, each uSB-A 2. 4a max with smart ic charging technology, will automatically identify the connecting devices and output optimal charging speed for your devices.
BrandSAMERIVER #ad
ManufacturerSameriver #ad
ModelZYC08
Warranty1 Year Warranty Against Manufacturer Defects

10. SAMERIVER

#ad

Black,3M Extension Cable for Home, Kitchen, Office, Extension Lead with USB Slots, Sameriver 13A 3250W Mini Tower Extension Lead 3M with 8 AC Outlets & 4 USB Ports Multi Plug Extension Tower

#ad
SAMERIVER #ad - Such as your computer, MP3, cellphone, tablet. Smart usb charging: tower extension lead has 4 usb portsmax output 3. 4a/17w in total. With a tower design you can tidy your cable and gives your usb devices a safe faster speed charge! Create an organised and neat space. You can turn off all electronic devices when not in use to save energy, In the event of a power overload, also, the red button at the bottom serves as an overload protection switch, it can also provide excellent protection for your electronic equipment.

All-round protection: tower extension lead is certified by fcc and rohs etc, and the products meet the safety requirements. Usb-c delivering 3. 0a max, each uSB-A 2. 4a max with smart ic charging technology, will automatically identify the connecting devices and output optimal charging speed for your devices. 12-in-1 tower extension lead: extension cord with 8 ac outlets in different directions and 4 USB ports can charge 12 electronics at the same time.

Multiple protection: a switch on the bottom of the plug extension tower controls the entire power supply. 3m 100% pure copper power extension long cord ensures excellent heat dissipation and great conductivity, tower extension lead have passed the tests of authoritative testing institutions, ensure an all-round protection for you and your electronic devices. Security tips: please check the power requirements of your appliances before use, the total power of the connected appliances is not allowed to exceed the rated power 3250W.
BrandSAMERIVER #ad
ManufacturerSameriver #ad
Height0.04
Length3.46
Width3.46
ModelZYC08
Warranty1 Year Warranty Against Manufacturer Defects